Repairs in buildings with more than one use
Begin by drawing the public/private line. Note whether access is through a shop, side door, communal hall or independent entrance. Identify times when deliveries, customers or residents use that route heavily. Then place the proposed work on the correct side of the line: inside a private room, on a shared stair or attached to fabric controlled by a landlord. This simple map informs timing and authority. It also prevents tool cases, packaging or dust control equipment occupying a circulation route. The job plan should preserve normal escape routes and give staff or residents one clear contact if access needs to change.

