Design around the actual room
Brochure dimensions are not a substitute for measuring the property.
KITCHENS & BATHROOMS Β· FITTING & FINISHING
Kitchens and bathrooms concentrate services, storage and high-use finishes into compact rooms. A clear survey and sequence helps new elements fit the property rather than creating avoidable compromises.

WHAT WE CAN HELP WITH
The scope is reviewed around the property, existing condition and the result you need.
Brochure dimensions are not a substitute for measuring the property.
Removing old units or sanitaryware can reveal damp, damaged substrates, obsolete connections or walls that need repair.
First-fix services, wall preparation and floor levels affect cabinetry, worktops, sanitaryware and tiles.
REFURBISHMENT SERVICES LONDON
Brochure dimensions are not a substitute for measuring the property. Walls may be out of square, floors uneven and existing service positions restrictive. Before ordering, record the room, openings, appliance clearances, ventilation, storage needs and the location of water, waste, gas and electrical connections. Product specifications should be available for every fitted item. Layout aspirations then need to be tested against safe access, workable clearances and any specialist requirements.
Removing old units or sanitaryware can reveal damp, damaged substrates, obsolete connections or walls that need repair. Allow time to assess those conditions before fixing a rigid installation date for every subsequent task. Reusable items, disposal responsibilities and protection to stairs or communal areas should be agreed. Water and power isolation must be planned, particularly where the property remains occupied. Temporary facilities may be necessary when the only kitchen or bathroom is out of use.
First-fix services, wall preparation and floor levels affect cabinetry, worktops, sanitaryware and tiles. Qualified specialists are required where regulations demand them, including gas work and certain electrical tasks. Accurate product information prevents late conflicts between taps, wastes, cabinets, appliances and sockets. Once fixed elements are installed, sealing, decoration and final adjustments should follow the product requirements and curing times. Rushing finishes before the underlying work is ready creates defects that are difficult to correct later.

CAREFUL PROPERTY WORK
At completion, doors and drawers should operate freely, accessible plumbing connections checked under use, appliances positioned as specified and sealant lines reviewed. Product instructions, keys and relevant trade documentation should be retained. Snagging is most useful when measured against the agreed scope rather than subjective additions introduced at handover. For projects spanning several rooms and broader property upgrades, use the property-refurbishment page; this service stays focused on the connected demands of kitchens and bathrooms.
Cabinet layouts should reflect what needs storing, where doors can open and how people move through the room. In bathrooms, cleaning access, towel positions and maintenance of valves matter alongside appearance. Small practical decisions made before ordering often produce more value than adding decorative features after the core layout is fixed.
Tiles have nominal dimensions, batch variation and edge details; worktops and screens depend on finished measurements and sound supporting units. Templates should be taken at the correct construction stage. Confirm junctions, upstands, cut-outs and spare material before installation so that separate products resolve into one coherent finish.
A CLEAR PROCESS
Send the London postcode, photographs, measurements and the result you want.
The requirements, access, materials and appropriate trade are reviewed before work begins.
The planned work is carried out carefully, with any material change explained clearly.
REFURBISHMENT SERVICES FAQ
Useful answers for planning the work.
Yes, a defined partial scope may be possible, but interfaces with retained units, tiles, services and finishes must be assessed so the result can be completed neatly.
Only after dimensions, service requirements and specifications have been checked. Delivery dates should also allow secure storage and inspection before installation.
Use is often restricted and may stop completely during key stages. The programme should explain isolation periods, curing times and any practical temporary arrangements.
Work must be routed to the appropriately qualified or registered trade where required. The scope should identify those responsibilities rather than treating them as general fitting.
Common causes include late product decisions, hidden substrate damage, incompatible items, access restrictions and changes after first fix. Early surveys and decision dates reduce uncertainty.
YOUR NEXT STEP
Share the room plan, product choices and priorities for a coordinated refurbishment discussion.